+86-0519-85282061

Current path: Home > Industry Solution > New Energy Equipment

Module Line


With years of experience in developing power battery production lines, Mentechs can develop more targeted solutions by combining the latest technology and processes.

图片17.jpg

图片18.jpg

Takt Time: 2.3s/cell

 

Basic Processes: Automatic cell loading, circular line, automatic cell adhesive application.

 

Special Processes: Module stacking, automatic installation of end plate and insulation cover.

 

Project Features: Dual-line parallel design with an intelligent flexible scheduling system, allowing single-line operation as needed without interference between dual-line production.




Return to list
CONTACT

Leave Your Message

您的浏览器版本过低,请升级!